Case study · Mining

How AI cut unplanned downtime 22% at a major mine

Illustrative case study · Client details and outcomes await verification. Two years of ignored sensor data became a three-week early-warning system for equipment failure — and a new way of running maintenance.

HLM Digital Solutions / conceptual study
Illustrative outcomes

What changed

22%reduction in unplanned downtime
3 weeksaverage early warning before failure
$400k+estimated annual production savings
15%reduction in spares inventory
The problem

The starting point

Kariba Minerals ran maintenance on fixed calendars: components were replaced whether worn or not, yet catastrophic failures still arrived unannounced. A single mill gearbox failure had recently halted production for five days.

Ironically, the data to prevent this already existed — vibration, temperature and load sensors streamed readings that nobody analysed. Maintenance planning meetings worked from breakdowns, not forecasts.

The solution

What we built

HLM built a data pipeline consolidating telemetry from plant PLCs and historians into a time-series store, then trained failure-prediction models on two years of readings matched against the maintenance log.

The models score each critical asset daily. When failure probability rises, planners see the alert — with the contributing signals explained — inside the same dashboard they use for scheduling, and a work order is drafted automatically.

Implementation

How the rollout ran

Phased, transparent, and designed to earn trust at every gate.

Weeks 1–3: Data audit

Sensor coverage assessed, telemetry consolidated, two years of history cleaned and matched to maintenance records.

Weeks 4–8: Model development

Failure-prediction models trained and validated per asset class; alert thresholds agreed with engineers.

Weeks 9–12: Shadow running

Models ran silently alongside normal operations; every alert reviewed with the maintenance team to build trust.

Weeks 13–16: Go-live & handover

Dashboard and work-order integration launched; planners trained; retraining pipeline automated.

Illustrative quotation · not a verified testimonial

“For the first time, the machines tell us when they need attention — before they fail. Maintenance has moved from firefighting to planning, and the numbers speak for themselves.”
Engineering Manager
Kariba Minerals*

Facing a similar challenge?